Senior Electrical Commissioning Project Engineer-Data Center Construction
FST Technical Services
Full-time
other-general
Location
Atlanta, GA, United States
Posted
June 24, 2026
Job Description
Lead the Systems That Power Critical InfrastructureĀ
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.Ā
Ā
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakesĀ environments.Ā
Why This Role Stands OutĀ
This is not a checklist-driven commissioning role.Ā
Ā
This is a position for someone who:Ā
⢠Owns outcomes, not just tasksĀ
⢠Understands systems holistically, not in silosĀ
⢠CanĀ operateĀ independently while leading othersĀ
Ā
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.Ā
WhatĀ YouāllĀ DoĀ
Project Lead...
At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.Ā
Ā
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakesĀ environments.Ā
Why This Role Stands OutĀ
This is not a checklist-driven commissioning role.Ā
Ā
This is a position for someone who:Ā
⢠Owns outcomes, not just tasksĀ
⢠Understands systems holistically, not in silosĀ
⢠CanĀ operateĀ independently while leading othersĀ
Ā
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions.Ā
WhatĀ YouāllĀ DoĀ
Project Lead...