Senior Construction Planner – Baseline & Critical Path

Unik Civil Engineering (Pty) Ltd

Full-time Engineering
Apply Now
Location
johannesburg, gauteng, South-Africa
Posted
July 18, 2026

Job Description

Unik Civil Engineering (Pty) Ltd is seeking a Construction Planner to create, maintain and analyse the project’s master schedule, translating drawings and tender data into a robust Construction Baseline Program that guides the Critical Path.

The role ensures time and cost linkage, validation of production rates, optimization of resource histograms, and provides an early warning system for audits and contractual claims on infrastructure projects across the region.

#J-18808-Ljbffr