Location
birr, aargau, Switzerland
Posted
July 15, 2026
Job Description
Job Description Summary
The Master Scheduler in Birr Rotor Shop works within the Materials Management Organization as a production planner for the manufacturing of generator rotors, gas turbine rotors and steam turbine rotors. The role ensures delivery reliability of customer orders, focusing on inventory reduction and optimal resource utilization.
Job Description
Responsibilities
- Ensure strict adherence to the Master Schedule with the goal of achieving 90% OTD while maximizing the utilization of production resources (machinery and personnel) and minimizing inventory levels.
- Develop and maintain detailed project plans using Microsoft Project and FELIOS (APS in GEV Birr).
- Perform feasibility analyses and conduct thorough reviews of customer orders, forecasts, and quotations.
- Provide support for capacity utilization analysis and longβterm production planning.
- Conduct regular planning meetings with d...