Location
lac jacques cartier, qc, Canada
Posted
July 13, 2026
Job Description
Find the right energy here and come generate something big with us!
Des Neiges – Secteur Sud wind farm is located in the unorganized territory of Lac-Jacques-Cartier in the MRC of Côte-de-Beaupré, south of the existing wind farms. It will include 57 wind turbines of 7 MW each, for a total capacity of 400 MW.
As part of this project, Borea is seeking motivated apprentices for the trades listed below and is committed to facilitating their participation in a Red Seal designated trade program. Borea offers apprentices the opportunity to join a diverse site team and enables them to be involved in multiple aspects of wind farm construction.
Apprenticeships
- Heavy Equipment Operator Apprentice – CCQ Start Date: March 2026
- Excavator Operator Apprentice – CCQ Start Date: March 2026
- Crane Operator Apprentice – CCQ Start Date: March 2026
- Heavy Equipment Mechanic Apprentice – CCQ Start date: March 2026
- Line Worker...